30th April 2016

Broadside view of 66847, with an engineer passing the time with the Colas Rail crew, at 16.33. There is a lot of waiting around during these track occupations! I happened to be talking to one contractor over the weekend who worked with the road-railers. He had driven down from Cardiff to do his shift, but spent all of his time in his van waiting to be called up to work, only to have his shift end, and be relieved by a colleague. He then was due to drive back to Cardiff having not been needed at all!
![]() |